Community-Lab introduction

Timeline
Login

Parents and children of check-in [a35efa8d7a]

2012-09-27
16:36
Fix missing steps from the labels in the interactions diagram. check-in: 3900c1e7d7 user: ivan tags: trunk, cnbub-2012-1.0.2
16:18
Fix some defects in CN integration diagrams.

- Non-linked, different sized and capitalized "Community Network" text. - Non-linked green links to CN cloud. - Right-aligned "Research cloud" text. check-in: a35efa8d7a user: ivan tags: trunk

11:55
Minor fixes after review.

- Don't use abbreviations in challenges (CN) and experiments (RD) slides. - Use ampersand instead of comma in challenges. - Properly name CC license. - Remove visible frame from deleted slide in interaction diagram. check-in: 0c8fbe81e2 user: ivan tags: trunk, cnbub-2012-1.0.1